Blog Menu
Blog Menu

Blog Posts: April 2018

Mon Apr 23, 2018 at 2:50pm
The gas locker on a used narrowboat and it's installations will be inspected as part of the Boat Safety Scheme examination, however as there are four years time between each inspection, which is a relatively long time in gas locker terms, it is important to check for deterioration between these inspections. The gas locker can rapidly corrode if not kept regularly maintained and this could mean the difference between a BSS pass and a fail and cost even more down the line.What to do if you suspect....
Tue Apr 10, 2018 at 12:58pm
Will the Proposed Daventry Canal Arm Ever Be Built?A 1.6 mile canal arm from Daventry to the Grand Union Canal near Daventry in Northamptonshire was given approval by the Daventry planning department in January 2017, However building of the new canal arm is still in doubt due to lack of funding. If funding is found the new arm could see Daventry linked up to the Grand Union Canal. It would include six locks and is hoped that it would terminate in a new waterfront development in the centre of Dav....
Register for Boat Updates
©2018 Whilton Marina ltd | Website Design By Zarr